Frequently asked questions
Can a Type 3.2 certificate be added after material has already been produced?
Yes. In some cases the requirement is added to a production order at the mill, but more often it involves extra testing and inspection of material already in the warehouse - a sample is taken and tested under the witness of an approved authority.
Who witnesses the testing for a Type 3.2 certificate?
The additional sampling and testing is witnessed by an approved authority such as Lloyds or TUV. Once they have observed the testing and confirmed the results meet the specification, the paperwork is stamped as approved before the certificate is issued.
Does requesting a 3.2 certificate always mean re-testing material?
Not always. If the requirement is known before production, it can simply be built into the mill order. It is only when the requirement arises after material is already in stock that extra sampling, testing and witnessing of material already held in the warehouse becomes necessary.